2011Jul05

From FilteredPush
Jump to: navigation, search


Etherpad for meeting notes: http://firuta.huh.harvard.edu:9000/FP-2011Jul05


User: Zhimin Wang | User: BertramLudaescher | User: Lei Dou | User: Paul J. Morris | User: James Hanken | User: James Macklin | User:
"User:" cannot be used as a page name in this wiki.
| User:
"User:" cannot be used as a page name in this wiki.
| User:
"User:" cannot be used as a page name in this wiki.
| User:
"User:" cannot be used as a page name in this wiki.
| User:
"User:" cannot be used as a page name in this wiki.



Agenda

  • Update on Curation Package
  • Evaluation of embedded curation scenario
  • TDWG
  • Goals for the next few months

Reports

  • Paul
    • With Bob, composed a scenario for use of Kepler as an analytical capability in the network to clean data with data - new georeferences cause an existing georeferenced point to be identified as incorrectly georeferenced through re-analysis of the collector's track.
    • Cleaned up AOD ontology examples. Created illustrations of the AOD ontology examples. See: AOD_Extension_of_AO_for_Data#Examples
    • Created three AOD discussion documents illustrating ways to connect content of annotation to subject of annotation.
  • Zhimin
    • Code generation
    • Help Lei on the installation of filteredpush demo in virtual box
  • Lei
    • Installed FPush service in virtualbox
  • James
    • Reached out to TDWG for FP group to host session on annotation.

Notes

  • Update on Curation Package


Lei: Working this week on installing FP service in virtual box. After this need to work on documentation. Prospective release schedule in 2 weeks.

  • Evaluation of embedded curation scenario


Lei: Looks doable. Needs discussion, e.g. when a user sends a request, under what condidtions will a job be executed.

Paul: Perhaps configuration of analysis rather than a message.

Zhimin: We may need some kind of language to act a trigger for launch of continuous quality control analysies. In short term configuration and hard coded.

Lei: Implementation would involve FP network and Kepler. Coordinate with Maureen?

Paul: Yes.

  • TDWG


Bertram: FYI: collides with DataONE All-Hands-Meeting..


Bertram: DataOne project manager pointed out unfortunate overlap. Hosting a provenance working group at DataOne meeting.

James: Wrote to relevant people, no response yet.

  • Goals for the next few months


Paul: Curation package release. Prepare demo of embedded Kepler for continuous quality control in prototype package. Mapper. Network software. Annotations.

General agreement.